Correlation Engine 2.0
Clear Search sequence regions


Sizes of these terms reflect their relevance to your search.

Algal blooms in urban water system is an international concern, which especially in China, have become a major obstacle to the urban water environment improvement since the preliminary achievements were made in the treatment of black and odorous water bodies. The complex blooming mechanisms require a joint regulation plan. This study established a framework that consisted of three steps, i.e., simulation, optimization, and verification, to build an optimal joint regulation plan. By taking the urban river network in Suzhou Pingjiang Xincheng as a case study, the cost-benefits of six alternative regulation measures were assessed using an algal bloom mechanism model and the discounted cash flow model based on 70 regulation scenarios. The joint regulation plan was optimized using the marginal-cost-based greedy strategy on the basis of the cost-benefits of different measures. The optimized joint plans, which were verified to be global optima, were more cost-effective than the designed regulation scenarios, and reduced the average chlorophyll-a concentrations by 55.3%-60.1% compared with the status quo. Applying the optimized cost allocation ratios of each measure to adjust the existing regulation scheme of another similar case verified that the optimization results had great generalizability. Copyright © 2021 Elsevier Ltd. All rights reserved.

Citation

Dingkun Yin, Te Xu, Ke Li, Linyuan Leng, Haifeng Jia, Zhaoxia Sun. Comprehensive modelling and cost-benefit optimization for joint regulation of algae in urban water system. Environmental pollution (Barking, Essex : 1987). 2022 Mar 01;296:118743

Expand section icon Mesh Tags

Expand section icon Substances


PMID: 34953955

View Full Text